What is FF&E? Hotel FF&E glossary for furniture from Turkey
FF&E stands for furniture, fixtures and equipment. In a hotel budget it covers guestroom and bathroom furniture and fixtures, public-area and meeting-room furniture, softgoods such as carpet and curtains, kitchen and laundry equipment, and technology (HVS). OS&E (linen and operating supplies, a pre-opening cost) and the fixed fit-out (the building's hard costs) are separate lines.
Sheet GD-16Reviewed Rovers Contract
What FF&E covers
HVS, the hotel consultancy, splits a hotel development budget into six categories. Three of them decide what
“FF&E” means on a hotel order:
Budget category (HVS)
What sits in it
Is it FF&E?
Furniture, fixtures and equipment
Guestroom and bathroom furniture and fixtures; public-space and meeting-room furniture and fixtures; softgoods (carpet, drapes, room accessories); kitchen and laundry equipment; technology and telecom equipment
Yes
Pre-opening and working capital
Supply inventories: linen, operating supplies, first purchases
The general contractor’s building work and the subcontractors’ bids for plumbing, electrical and finishes
No: this is the fixed fit-out
Some lines move by contract or by brand: mattresses, kitchen equipment and in-room technology between FF&E and
OS&E, built-in joinery between FF&E and the fit-out. The FF&E schedule or the brand’s standards list settles each
line.
These are the words used in a hotel FF&E order from Turkey, as buyers, designers and factories use them. Each
definition is short; the link goes to the page that explains it in full.
Scope and documents
Term
Definition
Full page
FF&E (furniture, fixtures and equipment)
The movable and semi-fixed items that furnish a hotel: casegoods, beds, seating, lighting, soft furnishings and art. A hotel’s FF&E budget is separate from the building works.
The smaller items a hotel needs to operate: linen, towels, guest amenities, crockery, cutlery, minibar stock and housekeeping kit. It is usually bought on a separate package from the FF&E.
The factory-side drawing of each piece, with every dimension, material, joint, hardware item and finish code, issued for the buyer’s approval before production.
A refurbishment that replaces FF&E, fabrics and finishes without changing the room’s layout, bathrooms or services.
Ireland (a dated example of rooms returning to tourism)
Attic stock
Spare pieces and materials ordered with the package and stored by the hotel for later repairs, such as extra fabric, spare drawer fronts and edge banding.
Fixed, built-in woodwork such as wardrobes, wall panelling, vanities, doors and counters. “Millwork” is the US term; “joinery” is used in the UK and the Gulf.
A fabric abrasion test that rubs the fabric in a figure-of-eight under pressure and counts cycles. ACT’s guideline is 40,000 cycles for high-traffic public spaces.
A fabric abrasion test (ASTM D4157) that rubs cotton duck back and forth and counts double rubs. ACT’s guideline is 30,000 double rubs for high-traffic public spaces; it does not convert to Martindale.
Formaldehyde classes for wood-based boards. E1 is the European class of 0.1 ppm by the EN 717-1 chamber test; E0 is not a European class and comes from other systems such as China’s GB/T 39600. From 6 August 2026 the EU limit for furniture is 0.062 mg/m³.
The formaldehyde limits for composite wood in California (CARB Phase 2) and across the US (TSCA Title VI, the same limits); finished goods are labelled TSCA Title VI compliant.
The ICC’s rules that split costs, risk and tasks between seller and buyer in a delivery, such as EXW, FCA, FOB, CIF, DAP and DDP; the current set is Incoterms 2020.
The movement certificate that shows goods are in free circulation under the EU–Türkiye Customs Union, so industrial goods such as furniture enter the EU without customs duty.
The international standard for wood packaging: solid-wood crates and pallets are treated and stamped with the IPPC mark; plywood-only crates are exempt.
If a term in your BOQ or brand standard is not here, send the document. We read every line before a Turkish factory
prices it, and we will tell you what it asks for.
Sheet 09Start an orderRev COpenReply within one business day
Send the project the way you already work.
Email the files, message us on WhatsApp, or use the short form. A named engineer replies within one business day, with the questions we need answered before pricing.
01You send drawings or BOQ, or just the room count.
02An engineer reads it and asks what's missing.
03You get one quote, every line priced, the factory chosen per item.