For operators: furniture replaced floor by floor while the hotel stays open

You keep selling rooms while we replace the furniture one block of floors at a time. Every item is made in Turkey to your spec, packed by floor and room, and backed by attic stock and finish codes on file, so a damaged piece can be matched years later. One contact answers for the whole order.

Sheet FR-01Rovers Contract

What you get from us

You runWhat we give you
A hotel that stays openProduction and delivery split into room blocks that match the floors you can take out of order at one time
Your spec and finish standardsShop drawings, finishes and tests built from your spec; any test it names is priced as its own line
Rooms that must matchEvery finish, fabric and fitting coded in the order file, so the last floor matches the first
Damage after openingAttic stock and spare parts packed and labelled for your stores
One callOne named contact for the order, from the survey to the last floor

Replacing furniture while the hotel is open

A refit starts with a survey of the rooms as they stand today: wall lengths, socket and switch positions, door swings, and how the old pieces are fixed. Room types that look the same on the old drawings often differ on site, so the shop drawings are made from the survey, not from the original set.

The factory makes the order in the same blocks you close. Each block is packed by floor and room, crated in the order the fitters work, and labelled with the room number, so nothing sits in the corridor waiting to be sorted. Removing and disposing of the old furniture is by others unless the scope includes it. In the US the scope is manufactured and delivered; elsewhere our team also installs.

Your spec, not ours

Operators already hold a spec for guestrooms and public areas: materials, finishes, hardware, fire tests and durability tests. We build to it. Where the spec names a test, the test is booked on the build that will ship and priced as a line on the quote. Where the spec is silent, we propose a material or fitting and mark it on the shop drawing for your approval before anything is cut.

Attic stock and spares

ItemWhat can be ordered with the furniture
Fabrics and leathersExtra metres from the same dye lot, so a re-cover matches
Laminate, veneer and edgingSpare sheets and edge band from the batch used on the order
HardwareHinges, handles, drawer runners and glides by part number
Finish referencesPaint, stain and lacquer codes with the approved sample on file
Whole piecesExtra nightstands, chairs or headboards when your spec asks for them

Attic stock is priced as its own lines, so you choose the quantity. It ships with the last block, packed and labelled for your stores.

Where to start

Send the room count by type, the floors you can close at one time, your spec and finish schedule, and photos or drawings of the current rooms. We reply the same business day with what we need to price it.

Sheet 09Start an orderRev COpenReply within one business day

Send the project the way you already work.

Email the files, message us on WhatsApp, or use the short form. A named engineer replies within one business day, with the questions we need answered before pricing.

  1. You send drawings or BOQ, or just the room count.
  2. An engineer reads it and asks what's missing.
  3. You get one quote, every line priced, the factory chosen per item.
  4. Samples and shop drawings, then production.

Your reference W-···· · quote it in any message

Email · recommended for filesEmail the drawings or BOQprojects@roverscontract.com · any size, any format, copy your team inOpen email →
Or the short form
Add drawings or BOQ (optional)PDF, DWG, XLSX, images · up to 50 MB each