Buying hotel furniture from Turkey: factory direct, FF&E contractor, purchasing agent or dealer

There are four common ways to buy hotel furniture from Turkey: straight from a factory, through an FF&E package contractor, through a purchasing agent, or from a dealer or importer. They differ in who reads the drawings, who picks and checks the factory, and who answers when something goes wrong. Direct buying needs the most in-house work; a contractor takes the package on as one job; an agent runs the buying for you under your own contracts; a dealer sells what is already made.

Sheet GD-07Reviewed Rovers Contract

A hotel owner buying furniture from Turkey has four routes. The furniture can come from the same Turkish factory in all four. What changes is who does the work around it: reading drawings, picking and checking the factory, inspecting, packing, shipping, installing, and answering for the result.

The four routes side by side

Factory direct FF&E package contractor Purchasing agent Dealer or importer
Who reads the drawings and BOQ You, or your designer The contractor The agent, with your designer Nobody: you choose from a range
Who picks the factory You The contractor, by fit for each line The agent runs a tender; you approve The dealer already has its makers
Price format The factory’s own quote, often in its own layout One quote, every BOQ line priced Supplier quotes, compared by the agent Catalogue or list price
Shop drawings and samples Between you and the factory Contractor produces and runs them Agent chases them; supplier produces Rarely; product is fixed
Quality control Your own visits or a hired inspector Contractor on the floor and at pre-packing Agent’s inspections, under your contracts Dealer’s own checks on stock
Shipping documents Factory and your forwarder Contractor arranges Agent coordinates suppliers and forwarder Dealer delivers from its warehouse
Single point of contact No: one per factory, plus forwarder Yes Yes for coordination; each supplier for its goods Yes, for stock items
Who holds the supply contract You, with each factory You, with the contractor You, with each supplier You, with the dealer
Who answers for defects and delivery Each factory, under your contract with it The contractor Each supplier; the agent helps resolve The dealer
How it is paid Factory price Line prices in one package quote A fee, separate from the goods The dealer’s resale price

Factory direct

Buying direct means one contract per factory and nothing in between. It suits a buyer with an FF&E team: someone to turn design intent into a BOQ, approve shop drawings, run a mock-up, visit the floor, book freight and handle import. On a full hotel the furniture is spread over several factories (casegoods, upholstery, beds, metal, stone), so “direct” usually means running several contracts at once. Each factory answers for its own goods. Gaps between them, like a headboard that doesn’t meet the wall panel, fall to the buyer.

FF&E package contractor

A package contractor takes the whole furniture scope as one job. It reads the BOQ and drawings, decides which factory builds which lines, produces shop drawings for approval, runs samples, follows production, inspects before packing, ships and installs. The owner signs one supply contract and gets one quote with every line priced. The contractor answers for the package as delivered, including the fit between items made in different shops.

The contractor picks the factory for each line. The owner sees that choice in the itemised quote, and on visits to the floor during production.

Purchasing agent

A purchasing (procurement) agent buys on the owner’s behalf. Industry write-ups describe the agent tendering to suppliers, comparing bids, tracking production, organising inspections and coordinating freight, customs and installation. Under the agent model the owner holds the contracts with each supplier, and the supplier, not the agent, is liable for defects; the agent helps resolve them. Money the agent receives from the owner is kept apart and used only for the owner’s purchases.

Agents are paid a fee: a fixed sum, a share of the managed spend, or a retainer. One 2026 industry guide puts agent fees at 3% to 6% of FF&E and OS&E procurement value (market data, Hotel Development Guide). Agents are common on branded projects and large openings, where the owner wants open supplier prices and its own name on every contract.

Dealer or importer

A dealer sells finished products from its makers’ ranges, often from stock in the buyer’s country. Delivery is fast and the product is known. The limits are the range itself and the finishes on offer: a dealer rarely builds to a hotel’s own drawings. It fits small orders, replacements and fast openings with a standard look.

Which route fits which project

Situation Route that tends to fit
In-house FF&E team, one or two simple item types Factory direct
Full custom package, owner wants one party to answer for it FF&E package contractor
Brand project with a procurement budget line and many suppliers Purchasing agent, often working with contractors and factories
Small order, replacements, a standard range Dealer or importer

The routes also combine. A purchasing agent can tender a casegoods package to a contractor, and a contractor can buy chairs from a dealer range.

The delivery term (Incoterm) is a separate choice on every route. EXW, FOB, CIF and DAP set where the seller’s job ends and the risk passes to the buyer.

Where Rovers fits

Rovers Contract is an FF&E package contractor working with Turkish partner factories. We read the BOQ and drawings, price every line with the factory that fits the project, produce shop drawings for approval, run samples, follow production on the floor, inspect before packing, pack, ship, and install outside the US. Purchasing agents and fit-out contractors can tender a package to us the same way an owner can.

What to send us

Send the BOQ or drawings, the city and the opening date. If an agent or contractor runs the tender, send their format and we fill it line by line.

Sources
  1. Stoch Hotel Consulting: What does a hotel procurement company do? (fee models: fixed, percentage of spend, retainer) · accessed 2026-10-04
  2. Stoch Hotel Consulting: Independent vs contractor-led procurement (I. Stoch, 2026-07-03) · accessed 2026-10-04
  3. Hotel Development Guide: Hotel FF&E and OS&E procurement (agent fees 3% to 6% of procurement value, market data) · accessed 2026-10-04
  4. DOS & Co: Purchasing FF&E as agent or principal (title, liability, client funds) · accessed 2026-10-04
  5. ICC: Incoterms rules · accessed 2026-10-04
Sheet 09Start an orderRev COpenReply within one business day

Send the project the way you already work.

Email the files, message us on WhatsApp, or use the short form. A named engineer replies within one business day, with the questions we need answered before pricing.

  1. You send drawings or BOQ, or just the room count.
  2. An engineer reads it and asks what's missing.
  3. You get one quote, every line priced, the factory chosen per item.
  4. Samples and shop drawings, then production.

Your reference W-···· · quote it in any message

Email · recommended for filesEmail the drawings or BOQprojects@roverscontract.com · any size, any format, copy your team inOpen email →
Or the short form
Add drawings or BOQ (optional)PDF, DWG, XLSX, images · up to 50 MB each